Customization: | Available |
---|---|
Connection Form: | Welded Connection |
Market: | Australia, UAE, Ksa, Singapore, Malaysia |
Still deciding? Get samples of US$ 860/Ton
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Place of Origin: | Shanghai, China (Mainland) |
Type: | Custom Steel Structure Fabrication Company Metal Steel Structure Warehouse Building in China |
Certification: | ISO 9001:2008, CE/COC/ certificate when request |
Service life: | more than 50 years |
Delivery Detail: | 30 days after received deposit and drawing confirmed |
Packaging Details: | steel structure flat packed in container, sheeting packed by paper, fittings in cartons or bags |
MOQ: | 1 Set Industrial Shed Design Steel Warehouse |
Supply Ability: | 60000 Square Meter Per month, 1000 ton/month |
Port: | basic port, China |
Payment Terms: | T/T,L/C,Western Union |
Connection Method
The columns are connected with the foundation by pre-embedding anchor bolt
The beams and columns, beams and beams are connected with high intensity bolts